Module support systems
- Module mounting structure design
- Foundation drawings
- Coordination with array layouts
Civil and structural deliverables for mounting systems, equipment and supporting infrastructure, coordinated with the plant layout.

BRK’s civil scope covers module mounting structures and plant facilities. Layout coordination links structural and foundation decisions to equipment locations, cable routes and the electrical design.
Foundation and structural design require suitable project inputs. Missing site or geotechnical information must be identified before design assumptions are accepted.
Our delivery framework covers scope alignment, design development, review, controlled submissions, execution support and handover within the contracted work.
See the engineering delivery processThe profile lists structures, equipment foundations, control buildings and selected site facilities. The exact facilities and deliverables should be listed in the work package; additional infrastructure is discussed separately.
Share your project location, capacity, application, available inputs, required deliverables and target programme. BRK can then discuss the responsibility split and the work package with your team.